Buyers who need more than a few gigabits between two sites usually end up choosing between two products. A DWDM wavelength is a fixed amount of capacity on the carrier's optical system: the carrier owns the optics, monitors the light and fixes it when it breaks. Dark fibre is a pair of unlit strands: you put your own optics on each end and decide what runs over them. This note compares the two on what actually decides the choice, with our indicative prices as worked examples.

What each product is

A wavelength is sold at a fixed rate. We sell managed wavelengths at 100G and 400G. The carrier delivers a handoff at each end, usually a 100G or 400G Ethernet port, and is responsible for everything in between, including the amplifiers, the protection switching if you buy it, and the repair.

Dark fibre is sold by length and term, not by capacity. What you can carry depends on the optics you install, and you can upgrade them without asking anyone. We offer dark fibre in the Sofia metro today, reaching the data centres and business buildings in the city. A route to Kalotina, on the Serbian border, is on the roadmap.

Distance decides more than anything

Dark fibre makes sense where you can light it with simple optics. Inside a city, a pair of coherent pluggable transceivers in your own routers can run 100G or 400G over tens of kilometres with no other equipment. Over hundreds of kilometres, you need amplifiers, and often regeneration, along the route, in sites you don't control. That is exactly what a carrier's DWDM system provides.

So the usual pattern is: dark fibre in the metro, wavelengths between cities. Sofia–Frankfurt is about 24.5 ms round trip over three diverse routes. Nobody but a carrier should be lighting that.

Cost: a worked example in Sofia

Take a 10 km route between two data centres in Sofia.

OptionIndicative price
Dark fibre lease, per pair€800 per month (€0.08 per metre per month)
Dark fibre, 15-year IRU€60,000 one-off, plus about €2,700 a year for operation and maintenance
100G wavelength, Bulgarian domestic list price€1,200 per month
400G wavelength, Bulgarian domestic list price€3,200 per month

On these numbers the fibre lease costs less per month than a single 100G wavelength. It also carries several 100G or 400G channels if your optics allow, with no extra monthly charge. The catch is that you buy, spare and operate the optics yourself, and your team handles the light layer.

The IRU and the lease cross over at about nine years. Over the full 15 years the IRU comes to roughly €100,000 including maintenance, against about €144,000 for the lease. An IRU pays off if you are sure you will need the route for most of its term.

For context, inner-city dark fibre pairs in Germany are listed at about €800–2,500 a month for routes up to 10 km (Savecall).

Cost: a worked example between cities

Between Sofia and Frankfurt there is no dark fibre option from us; this is a wavelength route. A 100G wavelength is €2,400 a month and a 400G wavelength €6,500 on our list. That is 2.7 times the price for four times the capacity. On the most competitive European routes the gap is similar: TeleGeography reports a weighted median of $1,150 a month for 100G Frankfurt–London in Q3 2025, with 400G at about 2.7 times that price (TeleGeography). Sofia–Frankfurt is longer and has fewer competing carriers, so it sits higher.

If you will grow past 200G on a route within the contract term, a 400G wavelength is usually cheaper than two or three 100G ones.

Control and operations

Dark fibre gives you full control. You choose the optics, the protocol and the upgrade schedule, and nobody else's equipment sits in the path. You also own every fault on the light layer. When a transceiver dies at 3 a.m., it is your team that drives to the data centre.

A wavelength hands that work to the carrier. You get a port, a monitored service and an SLA with a repair target. For a wavelength that is four hours on our SLA; for dark fibre it is eight, because a cut cable needs a splicing crew. The trade is simple: less control, less work.

Time to service

A wavelength on an existing system can often be activated within weeks. New dark fibre can take longer if the last metres into a building need building, and an IRU adds contract work. Plan dark fibre earlier.

A short rule

Choose dark fibre when the route is inside one city, you expect to grow well beyond 100G, and you have the people to run optics. Choose a wavelength when the route is between cities, you want one carrier to answer for the whole path, or you need capacity soon. Below 100G, neither is the right product: an Ethernet or L2VPN circuit is cheaper and simpler.

All prices above are indicative list prices, not a quote. The final price depends on the route, the term and the commercial terms.

Sources

Sofia Connect Insights

Weekly analysis on regional telecom infrastructure

DWDM, submarine cables, IP transit, peering, regulation, M&A — one email per week, written for engineers and decision-makers. No marketing.

By subscribing you agree to receive emails from Sofia Connect EAD. You can unsubscribe at any time. Privacy.