Skip to main content
Sofia Connect
Sofia Connect EdgeBulgaria

Varna — Black Sea Metro and DWDM

The Black Sea's largest metro — 5 ms from Sofia, with direct onward paths to the Balchik submarine landing.

Facility
Sofia Connect Edge
Latency from Sofia
5 ms
Services
2
ASN
AS47872

Why Varna

  • Sofia Connect Edge with IP transit and DWDM
  • 5 ms latency to Sofia core
  • Direct DWDM path to Balchik Caucasus Cable System landing
  • Serves Black Sea shipping, tourism and regional enterprise

Varna is the largest metro on the Bulgarian Black Sea coast and a critical link between Sofia and the Balchik CCS submarine cable landing. Customers use our Varna Edge for IP transit, metro wavelengths, and as the aggregation point for traffic coming off the Caucasus Cable System.

Frequently asked

Is there a direct path from Varna to Balchik?
Yes. Our protected DWDM ring includes Varna → Dobrich → Balchik with diverse regeneration.
What latency should I expect?
5 ms to Sofia, 2 ms to Balchik.

Ready to extend your network into Varna?

Our engineers will scope the optimal path and SLA. Typical provisioning is 5–10 business days.